IFC PS-Aligned, by Design
The compliance framework AYMTEC operates to is not a marketing claim. It's the language of the people who hold the purse strings on African mega-projects: IFC, AfDB, EBRD, Africa50, US DFC, Equator Principles banks, and the IOCs and EPC majors that finance through them.
Compliance failures cost more than the camp budget
On a DFI-financed project, an IFC PS2 violation (worker accommodation conditions, labour grievance mishandling, retrenchment without proper consultation) can trigger:
- Loan disbursement holds (project finance frozen until remediation accepted)
- EPC schedule slippage cascading into LDs and rework costs
- IFC CAO complaints (independent compliance review with public-record outcomes)
- Equator Principles bank withdrawal pressure
- Reputational damage that follows the operator across future projects
Most camp providers compete on bed-night price. AYMTEC competes on the bar that determines whether your project finance survives an audit.
PS1 through PS8 — Where Each Applies
| PS | Standard | How It Applies in AYMTEC Engagements |
|---|---|---|
| PS1 | Assessment & Management of Environmental and Social Risks and Impacts | Every project. Foundation of the IFC PS framework. |
| PS2 | Labour & Working Conditions | Core to every camp and BOO logistics base. Labour management systems, accommodation standards (IFC/EBRD Workers' Accommodation Standard), grievance mechanisms, retrenchment, supply-chain labour. |
| PS3 | Resource Efficiency & Pollution Prevention | BOO power and water utilities. Emissions, wastewater, waste, hazardous materials, GHG accounting. |
| PS4 | Community Health, Safety & Security | Camp interface with host communities. Security personnel conduct, emergency response, infrastructure safety, communicable disease management. |
| PS5 | Land Acquisition & Involuntary Resettlement | Agribusiness, mining, and large infrastructure with footprint impact on local land use. |
| PS6 | Biodiversity Conservation & Sustainable Management of Living Natural Resources | Sites in or near sensitive ecosystems. Agribusiness and mining sites in West Africa. |
| PS7 | Indigenous Peoples | Mining and infrastructure projects in regions with indigenous populations. Free, Prior and Informed Consent (FPIC) requirements. |
| PS8 | Cultural Heritage | Project siting near tangible or intangible cultural heritage assets. Critical in Algeria, Morocco, Mali for archaeological / cultural sites. |
Beyond IFC PS
World Bank EHS Guidelines
General + sector-specific EHS performance levels referenced in most DFI loan covenants.
Equator Principles (EP4)
Risk management framework adopted by 130+ commercial banks for project finance >$10M.
IFC/EBRD Workers' Accommodation: Processes and Standards
The reference document for camp design, operation, and accommodation conditions.
ISO 45001:2018
Occupational Health & Safety Management Systems.
ISO 14001:2015
Environmental Management Systems.
OHSA / NEBOSH
Personnel safety qualifications applied across HSE leadership and supervisory roles.
OGMP 2.0
Oil & Gas Methane Partnership 2.0 — relevant for oil & gas operators required to report under the Global Methane Pledge and EU Methane Regulation.
ILO Core Conventions
Forced labour, child labour, freedom of association, non-discrimination — embedded in IFC PS2 labour management systems.