Standards & Compliance

IFC PS-Aligned, by Design

The compliance framework AYMTEC operates to is not a marketing claim. It's the language of the people who hold the purse strings on African mega-projects: IFC, AfDB, EBRD, Africa50, US DFC, Equator Principles banks, and the IOCs and EPC majors that finance through them.

Why This Matters

Compliance failures cost more than the camp budget

On a DFI-financed project, an IFC PS2 violation (worker accommodation conditions, labour grievance mishandling, retrenchment without proper consultation) can trigger:

  • Loan disbursement holds (project finance frozen until remediation accepted)
  • EPC schedule slippage cascading into LDs and rework costs
  • IFC CAO complaints (independent compliance review with public-record outcomes)
  • Equator Principles bank withdrawal pressure
  • Reputational damage that follows the operator across future projects

Most camp providers compete on bed-night price. AYMTEC competes on the bar that determines whether your project finance survives an audit.

IFC Performance Standards

PS1 through PS8 — Where Each Applies

PS Standard How It Applies in AYMTEC Engagements
PS1 Assessment & Management of Environmental and Social Risks and Impacts Every project. Foundation of the IFC PS framework.
PS2 Labour & Working Conditions Core to every camp and BOO logistics base. Labour management systems, accommodation standards (IFC/EBRD Workers' Accommodation Standard), grievance mechanisms, retrenchment, supply-chain labour.
PS3 Resource Efficiency & Pollution Prevention BOO power and water utilities. Emissions, wastewater, waste, hazardous materials, GHG accounting.
PS4 Community Health, Safety & Security Camp interface with host communities. Security personnel conduct, emergency response, infrastructure safety, communicable disease management.
PS5 Land Acquisition & Involuntary Resettlement Agribusiness, mining, and large infrastructure with footprint impact on local land use.
PS6 Biodiversity Conservation & Sustainable Management of Living Natural Resources Sites in or near sensitive ecosystems. Agribusiness and mining sites in West Africa.
PS7 Indigenous Peoples Mining and infrastructure projects in regions with indigenous populations. Free, Prior and Informed Consent (FPIC) requirements.
PS8 Cultural Heritage Project siting near tangible or intangible cultural heritage assets. Critical in Algeria, Morocco, Mali for archaeological / cultural sites.
Adjacent Standards

Beyond IFC PS

World Bank EHS Guidelines

General + sector-specific EHS performance levels referenced in most DFI loan covenants.

Equator Principles (EP4)

Risk management framework adopted by 130+ commercial banks for project finance >$10M.

IFC/EBRD Workers' Accommodation: Processes and Standards

The reference document for camp design, operation, and accommodation conditions.

ISO 45001:2018

Occupational Health & Safety Management Systems.

ISO 14001:2015

Environmental Management Systems.

OHSA / NEBOSH

Personnel safety qualifications applied across HSE leadership and supervisory roles.

OGMP 2.0

Oil & Gas Methane Partnership 2.0 — relevant for oil & gas operators required to report under the Global Methane Pledge and EU Methane Regulation.

ILO Core Conventions

Forced labour, child labour, freedom of association, non-discrimination — embedded in IFC PS2 labour management systems.

For DFI / Lender / Procurement Teams

Need a compliance brief for your project?

We can prepare a sector-specific PS gap analysis and worker-accommodation conformance assessment for your project — typically within 5 working days of scope confirmation.

Request Compliance Brief